A while back Southern Water were hassling us to install meters. I carefully pointed out that it is a steel framed building, and tennis ball sized devices in the proposed locations would be screened by water tanks. I can only use a mobile by the window during a power cut when the cordless base station is off.
Now Scottish and Southern want to replace my electricity meter with “the latest generation of smart meters” because “the radio network it uses will be phased out across the UK”. I presume (?) they are referring to a switching signal on 198khz. If so I hope all nuclear submarine commanders have got the email. If we survive the ensuing holocaust, there is no chance a cellular signal will get out of the meter cupboard, I will still be supplying readings online, and no doubt also spending hours on the phone trying to get them to explain why they want me to pay £4m a month.
Now Scottish and Southern want to replace my electricity meter with “the latest generation of smart meters” because “the radio network it uses will be phased out across the UK”. I presume (?) they are referring to a switching signal on 198khz. If so I hope all nuclear submarine commanders have got the email. If we survive the ensuing holocaust, there is no chance a cellular signal will get out of the meter cupboard, I will still be supplying readings online, and no doubt also spending hours on the phone trying to get them to explain why they want me to pay £4m a month.